一级黄色片夫妻性生活片-亚洲精品一区二区三区网-欧美日韩一级裸体黄色视-国产成人综合精品三级

 歡迎訪問濟(jì)南科爾超聲波設(shè)備有限公司網(wǎng)站!

專注生產(chǎn)工業(yè)用超聲波清洗機(jī)

讓工業(yè)清洗無難事

電話

業(yè)務(wù)咨詢電話:

18663767799

你所在位置: 首頁-新聞動態(tài)-新聞資訊低溫廢水回收設(shè)備的操作注意事項
新聞資訊

低溫廢水回收設(shè)備的操作注意事項

作者:admin來源:http://phdgoplaces.com/時間:2022-09-25

為了更好地使用低溫廢水回收設(shè)備,我們在使用設(shè)備時須更加注意正常運(yùn)行。以下是低溫廢水回收設(shè)備的操作注意事項,小編為您解答。
In order to better use the low-temperature wastewater recovery equipment, we must pay more attention to normal operation when using the equipment. The following are the precautions for the operation of the low-temperature wastewater recovery equipment, and I will answer them for you.
1、啟動低溫廢水回收設(shè)備時檢查電路、控制柜線路接線是否正確,電壓和電流是否符合要求。
1. When starting the low-temperature wastewater recovery equipment, check whether the circuit and control cabinet wiring are correct, and whether the voltage and current meet the requirements.
2.低溫廢水回收設(shè)備的水泵采用防堵塞撕裂潛水排污泵。兩個水泵的控制由微型計算機(jī)通過檢測污水箱中的液位來完成。當(dāng)液位從低到高達(dá)到工作水位時,啟動工作泵。如果液位繼續(xù)上升到警告水位,關(guān)閉工作泵,啟動風(fēng)機(jī)時檢查旋轉(zhuǎn)方向是否正確,避免反轉(zhuǎn)。
2. The water pump of the low-temperature wastewater recovery equipment is a plug and tear resistant submersible sewage pump. The control of the two pumps is completed by the microcomputer through detecting the liquid level in the sewage tank. When the liquid level reaches the working water level from low to high, start the working pump. If the liquid level continues to rise to the warning water level, turn off the working pump, and check whether the rotation direction is correct when starting the fan to avoid reverse rotation.
3.當(dāng)調(diào)節(jié)箱內(nèi)污水較少,且液位低于水泵啟動液位時,兩臺水泵將停止工作。此時,為使低溫廢水回收設(shè)備中的生物膜正常生長,風(fēng)機(jī)將間歇啟動10分鐘,自動停止運(yùn)行半小時。
3. When there is less sewage in the regulating tank and the liquid level is lower than the starting liquid level of the water pump, the two water pumps will stop working. At this time, in order to make the biofilm in the low-temperature wastewater recovery equipment grow normally, the fan will start intermittently for 10 minutes and automatically stop running for half an hour.
低溫廢水回收設(shè)備
4.沉淀池排泥控制。電磁閥通過空氣提升污泥或污泥泵提升污泥。排泥周期為8小時,排泥時間為8分鐘。當(dāng)空氣被提升時,兩個風(fēng)扇同時啟動,以確??諝夤?yīng)。
4. Sludge discharge control of sedimentation tank. The solenoid valve lifts the sludge through air or sludge pump. The sludge discharge cycle is 8 hours, and the sludge discharge time is 8 minutes. When the air is lifted, both fans are started at the same time to ensure the air supply.
5.風(fēng)機(jī)和水泵由自動交替運(yùn)行控制,交替切換時間為4小時。
5. The fan and water pump are controlled by automatic alternate operation, and the alternate switching time is 4 hours.
6、低溫廢水回收設(shè)備控制中心微機(jī)柜上按設(shè)計安排的工作程序一次完成。手動控制是通過面板上的按鍵開關(guān),手動控制潛水排污泵和風(fēng)機(jī)的開關(guān)。
6. The micro cabinet of the control center of the low-temperature wastewater recovery equipment shall be completed at one time according to the designed working procedure. Manual control is to manually control the switch of submersible sewage pump and fan through the key switch on the panel.
低溫廢水回收設(shè)備的操作注意事項相關(guān)內(nèi)容便是如此了,如果您對此有什么不了解的地方,歡迎來我們網(wǎng)站phdgoplaces.com咨詢。
This is the case for the operation of low-temperature wastewater recovery equipment. If you have any questions about this, please visit our website at phdgoplaces.com.
亚洲中文字幕一区二区在线| 久久精品国产一区二区涩涩| 亚洲动漫av一区二区三区| 精品伊人久久大香线蕉| 国产一区二区三区蜜桃视频| 国产一区二区三区播放视频| 亚洲国产精品一区性色| 亚洲天堂一区在线播放| 久久精品资源综合网| 四虎精品免费在线观看| 久久精品亚洲精品国产高潮| 中文字幕亚洲精品99| av中文一区二区三区| 亚洲欧美高清一区二区| 日本99精品视频10| 精品人妻伦一二三区久久| 国产日韩手机在线不卡视频 | 日韩精品不卡在线播放| 一区二区三区视频毛片| 99久久久免费精品国产| 成人av在线天堂一区二区三区| 国产片a午夜福利视频九色| 日韩福利视频在线观看| 人妻少妇精品中文字幕| 国产精品中文字幕制服诱惑| 国产一区二区一卡二卡| 性感少妇一区二区三区| 四虎国产精品久久久久久| 国产精品一区日韩专区| 一本色道久久88综合日韩| 国产精品久久亚洲一区二区| 高清少妇一区二区三区| 久久久亚洲女同一区二区三区| 亚洲天堂毛片在线观看| 久久精品中文字幕无人区| 91久久综合精品久久久综合| 国产精品自拍视频合集| 亚洲熟妇av日韩av专区| 欧美日韩国产另类在线视频| 高跟美腿丝袜国产在线观看| 极品美女av一区二区|